Installation case studies

Arlington Lodge, Lambeth Borough Council

We recently carried out 6 passenger lift refurbishments at Arlington Lodge, over a 6 month period. For this project the client wanted to completely refurbish the existing 4 person passenger lifts with the exception of the guides. We completed the project ahead of programme and installed lifts that both the residents and the client were pleased with.

If you navigate to our ‘Testimonials’ Section, you can see the high praise from the consultant on this project.

Rogers Estate Block 226, Tower Hamlets Homes

We have recently finalised a complete refurbishment of an existing Hydraulic lift to Machine Room Less traction conversion, as part of phase 1 of the Tower Hamlets Lift Refurbishment Frame Work, of which we are lead contractors. This project involved the complete removal of the existing Hydraulic Lift installation, and full installation of a new MRL traction lift, including guides and brackets.

Elizabeth Court, London Borough of Redbridge

We have completed one passenger lift, and are currently working on the second lift at present, for this passenger lift refurbishment project for London Borough of Redbridge. This project involved us opening up entrances, on existing skip-stop lifts, to produce lifts which served all floors to the tower block. This is the 3rd project of this nature, which we have carried out, on the Orchard Estate, and we are currently in the process of being awarded the 4th, by the London Borough of Redbridge.